Industry · Mining

Mining: uSD/t · OTIF · fleet · HSEC

Operational and financial data crossed by site, with USD impact calculated and preventive fleet alerts.

What it measures

USD/t · OTIF · fleet · HSEC.

Fleet availability86.8%
Tonnage moved11.3M
Diesel consumption0.400
Recordable incidents27

The views it generates

Executive dashboard with key indicators by site.

Financial summary: actual spend against budget by category.

Operations summary: supplier ranking and unplanned failures.

Consolidated view of the holding or district on a single screen.

Digital asset record with maintenance history.

Alert engine by site and scope, with traceability to the data.

Quproc dashboard for Mining: operational and financial indicators with threshold alerts.
A view of the mining module. Figures are illustrative.

Where the data comes from

What is already recorded comes in: ERP and accounting, dispatch and shipping, truck and shovel telemetry, hour meters, work orders and the shift supervisor's spreadsheets. Nothing is migrated and no one's system changes.

Site operations and financial results are read on the same axis and in the same period. Cost per ton moved is calculated live against the real cost structure, not against last year's budget.

Alerts that fire on their own

Thresholds configurable by site, fleet, contract and supplier. Overdue preventive maintenance, OTIF below threshold and diesel performance out of range are flagged on their own, before the committee meets.

  • CRITICALOne truck with preventive maintenance 13 days overdue.
  • WARNINGOTIF for a critical supplier below the threshold set for the site.
  • INFOCorrelation of 0.98 between unplanned plant failures and incidents.

One engine, every industry

What changes between modules is the unit the industry already decides with and the thresholds that trigger its alerts. The calculation layer, the traceability and the delivery are identical. How the model works, in four stages.

This module falls under the same plans as the rest. See plans and pricing.

Download the one-pager (Spanish, PDF)

Send us a shift report and we will show you what comes out of it.

Thirty minutes is enough to see whether your site fits the model that already exists or whether it is worth adjusting to your operation. No cost, no commitment.